ASME B31.1 governs the design, materials, fabrication, erection, testing, and inspection of power piping systems. It applies to piping found in electric power generating stations, industrial and institutional plants, geothermal heating systems, and central and district heating and cooling systems. When your project involves steam, high-temperature water, or other power-cycle fluids, B31.1 is typically the governing code.
B31.1 covers piping systems that operate above 15 psig steam or above 160 psig/250°F water. This includes:
B31.1 sets specific requirements for how piping is fabricated, including:
Power piping frequently involves chrome-moly alloys — P11, P22, P91, and P92 — which require mandatory preheat, controlled interpass temperatures, and post-weld heat treatment. B31.1 defines the specific requirements for these materials, and fabrication shops must have qualified procedures and experienced welders to handle them properly. Improper heat treatment of chrome-moly piping can lead to premature creep failure in service — a safety issue that codes are designed to prevent.
Working with a fabrication partner that understands B31.1 requirements means your power piping fabrications arrive ready to pass examination, properly heat treated, and documented to code requirements. This reduces field rework, avoids examination failures, and keeps your project on schedule. Our experience with power piping materials, welding procedures, and examination requirements means fewer surprises during quality review.
Made with ♥ by Aelieve